Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


WHAT IS RMU AND WHAT IS ITS FUNCTION AND HOW TODISCONNECT

Answers were Sorted based on User's Feedback



WHAT IS RMU AND WHAT IS ITS FUNCTION AND HOW TODISCONNECT..

Answer / asif.k64@gmail.com

Ring mains unit - RMU mainly used to provide dual supply to
a building, in case one supply fails building can be fed
through a stand by supply, change over usually happens
automatically.
It usually is on the HT side, and consist of a dry type of
transformer and protection system, In order to disconnect it
you should first close the incomer of HT breaker through
which RMU is fed.

Wait it's not over yet, you should ground the Incomer and
outgoing terminal of RMU to insure safety.

Is This Answer Correct ?    11 Yes 0 No

WHAT IS RMU AND WHAT IS ITS FUNCTION AND HOW TODISCONNECT..

Answer / vijo

RMU means RING MAIN UNIT

Is This Answer Correct ?    6 Yes 2 No

WHAT IS RMU AND WHAT IS ITS FUNCTION AND HOW TODISCONNECT..

Answer / apu basak

Ring Main Units
Switch the load break switch into EARTH position with an
operation lever. As direct conversion into EARTH position
from ON position is impossible due to its mechanism that it
should be switched first to OFF position before the conversion
into EARTH position.
Only when load break switch is located at EARTH position
doors can be opened or closed.
In case any one of doors is opened, mechanism operation hole
is closed. Thus load break switch operation is impossible,
which means switching to ON position is not allowed
When the works such as replacement of fuse and cable repairs
are finished, all doors of fuse compartment, cable
compartment and cable test facility should be closed before
operation of LBS. The operation order to switch on is EARTH
&#8594; OFF &#8594; ON.
Each door is to be pad-locked to avoid unintentional opening
that may cause accident

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

In EHV transmission line a neutral grounding reactor is often placed at neutral point of shunt reactors. What is the recommended protection for this neutral grounding reactor? Should I use a fast closing switch to bypass neutral grounding reactor when this protection operates?

0 Answers   TATA,


if we apply 1000ADC instead of 100ADC or We apply 50ADC instead of 100ADC,What will be happened in the test result value.Pl explain

0 Answers   NCC,


PLC Training in chennai | PLC Training institute in chennai, PLC Training center in chennai | Best PLC Training in chennai | PLC Training course in chennai | SCADA Training in chennai | PLC Training in india

1 Answers   Exide,


the voltage per turn of a primary winding of a transformer is the same as the voltage per turn of the secondary winding of the transformer. why?

8 Answers  


what is the difference between high impedance & low impedance

1 Answers   L&T,


Is there any difference in AC current/ DC current carrying capacity of a conductor .What can be maximum current handling capacity of a 2.5mm stranded cu cable when connected to AC and DC supply.

1 Answers  


What are the properties of a resistor?

0 Answers  


Explain what is electric traction?

0 Answers  


why we usually call 415 volts instead of 440 volts

3 Answers   S Tech,


As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?

0 Answers  


which plant has high load factor

10 Answers   APTransco,


What are the causes for the failures of sandwich type (Al) busducts?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)