WHAT IS RMU AND WHAT IS ITS FUNCTION AND HOW TODISCONNECT
Answer Posted / apu basak
Ring Main Units
Switch the load break switch into EARTH position with an
operation lever. As direct conversion into EARTH position
from ON position is impossible due to its mechanism that it
should be switched first to OFF position before the conversion
into EARTH position.
Only when load break switch is located at EARTH position
doors can be opened or closed.
In case any one of doors is opened, mechanism operation hole
is closed. Thus load break switch operation is impossible,
which means switching to ON position is not allowed
When the works such as replacement of fuse and cable repairs
are finished, all doors of fuse compartment, cable
compartment and cable test facility should be closed before
operation of LBS. The operation order to switch on is EARTH
→ OFF → ON.
Each door is to be pad-locked to avoid unintentional opening
that may cause accident
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is transister define the transister ammiter ,base, colector.
can we start slipring motor on star delta like we start induction motor ? if yes where will we connect ?
Please define ohm’s law for a.c (alternating current)?
how to increase senstivity of ct
Define active filter?
Hi Everyone ! My Name is Hakim ullah khan please i need formula of Cable Rating because i want to calculate by self without check any Table Chart... Thank you.....
what is droop control?
what are the tests comes under the type test, what tests comes under routine tests.
Hello sir, pls send me hpcl technical test papers .i am. Appearing for the exam.
What is rotary phase converter?
how to calculate percentage impedence at 75 deg C at normal tap
What is the tipical Online UPS input voltage for 20 KVA load ( 3 Phase or 1 Phase )? Why ? Explain it...?
Explain in details how you would react to an unexpected incident when your supervisor or manager is not around to give instructions?
why we use four type of phase angle difference between pimary & secondry winding of a transformer & where we use them?
Define phase lag and phase lead?