Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

WHAT IS RMU AND WHAT IS ITS FUNCTION AND HOW TODISCONNECT

Answer Posted / apu basak

Ring Main Units
Switch the load break switch into EARTH position with an
operation lever. As direct conversion into EARTH position
from ON position is impossible due to its mechanism that it
should be switched first to OFF position before the conversion
into EARTH position.
Only when load break switch is located at EARTH position
doors can be opened or closed.
In case any one of doors is opened, mechanism operation hole
is closed. Thus load break switch operation is impossible,
which means switching to ON position is not allowed
When the works such as replacement of fuse and cable repairs
are finished, all doors of fuse compartment, cable
compartment and cable test facility should be closed before
operation of LBS. The operation order to switch on is EARTH
&#8594; OFF &#8594; ON.
Each door is to be pad-locked to avoid unintentional opening
that may cause accident

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

If ROC does not lies inside unit circle,then ? a) Fourier transform converges b) Z transform converges c) Hatly transform converges d) Colpit Transform converges.

2285


TRANSFORMERS WITH DC SUPPLY

2079


what is the basic construction diffrance between servo motor ans sqiralcage induction motor

2487


What is the permissible maximum flux density in transformer core?

1237


Is it possible to operate a synchronous 2-poles turbogenerator with a still-in-place faulted bar but electrically disconnected ???? If yes, should I act on the other phases as well ???

1975


WHAT ARE THE DATAS REQUIRED FOR PROTECTION AND METERING AND CONTROL AND LOGIC PREPARATION,HOW TO STUDY THE PROTECTION AND METERING?

2209


Advantages/Disadvantages of earthing of neutral bus on MSB instead of separate neutral earthing for transformer/DG sets feeding to MSB

2799


from which formula we select a capacitor rating?

2127


how to find ratio of CT & PT in 66/11kv 12 mva supply system ? explain with calculation.

2411


working principle a.v.r. ?

2419


how to calculate short circuit current for the busbar

1508


how we can calcultae the short circuit level for bus bar

2239


how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating

2415


What is the general power factor & min. power rating of TV,LCD type TV, CRt type TV, Scanner, printer?

2070


where we use the SFU & FSU?

2415