Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


one KVAR takes how much amps, and how to add power capacitors
to electrical panels, for example if one of the MCC drawn
800amps means how much KVAR required



one KVAR takes how much amps, and how to add power capacitors to electrical panels, for example if..

Answer / wareagle

Before you can answer this question you must knoiw the load
power factor.
KVAR amps = KVAR/(kv x 1.73) eg 600 kvar 400 volts
600/
(0.4 x 1.73 = 867 amps
To determine tha KVAR required you must know the existing PF
Then you determine what you want the new PF to be before
you can calculate the new PF.

Is This Answer Correct ?    1 Yes 2 No

Post New Answer

More Electrical Engineering Interview Questions

When VFD is connected to a 3 phase main supply there is load current difference between incomer to VFD and outgoing from VFD.

1 Answers   Shasun Chemicals,


after how many spot we must chang secondry cable in portable spot welding gun?

0 Answers  


what will happen if multimeter(selector switch at DC voltage) and terminal at current is connected to DC supply?

0 Answers  


what r the tests on the 3 phase transformers can any one explain how to test using megger on transformers thx

2 Answers  


if 15 kv is grounding directly what will happen?

5 Answers  


As i want some model question paper in basic computer science and history please send me immediately sir

0 Answers   TNPSC Tamil Nadu Public Service Commission,


why vector group is ued

2 Answers  


234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,

0 Answers   Jomel,


how much current a 100 sq mm busbar will carry?

1 Answers   ABB,


Under Ground Power cable earthing is required at both end or single end? and reason for the same

3 Answers  


How to calculate Maximum Demand from Energy meter Reading.

1 Answers   Etisalat,


Why Power generation in India is at 50Hz while in America its 60Hz so is there any advantage/Disadvantage of this ??

38 Answers   Australia Visa, College School Exams Tests, Fiat, InfoPlus, L&T, NTPC, TCS,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)