How much Strength of the cube can attain in 7days
comparative 28 days strength?(as per IS code) ( specify the
ref.clause also)
Answers were Sorted based on User's Feedback
Answer / asif
After 7 days it should achieve 70% strength, and after 28 days it should achieve 120% strength.
| Is This Answer Correct ? | 27 Yes | 8 No |
Answer / kumaresan
at Seven days, it should be 70% and at 28 days it should be
100%
| Is This Answer Correct ? | 13 Yes | 1 No |
Answer / shri
at 7 days 2/3 of grade and at 14 days 1/3 of grade
| Is This Answer Correct ? | 7 Yes | 3 No |
Answer / shalu verma
after 7 days it achieve 70% strenght bt after 28 days it
achieve 85% strenght.
| Is This Answer Correct ? | 8 Yes | 5 No |
Answer / manoj kumar bhola
AT 7 DAYS STRENGTH WILL BE 67% AND AT 28 DAYS STRENGTH WILL BE 100%
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / hemanta ku.das.(tuv-sud)
Sp-24,page no-20 ,give this formula to find out the different grade of concrete for different age
t
Ft = ............... *F28
a+ (b*t)
a=4.7,b=0.833. constant
t=time period,(days)
F28=grade of concrete.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / lalit kumar singh
Strength of cube in
07 days - 67%
28days - 85-90 %
| Is This Answer Correct ? | 0 Yes | 0 No |
50m3 concrete volume how much cement sand aggregate details radio m20grade
5 Answers L&T, Mars Planning Engineering Services, Relcon Infraprojects,
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
Prepare a Schedule for a Highrised building from starting stage to Handover?
how much % of fine sand(jamuna sand)we can use with coase sand for making concrete.
if cement is 70 kg. sand is 140 kg and coarse aggregate is 280 kg. so what is volume of cement, sand and coarse aggregate? please explane it.
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
for 1cum how much bag of cement is used for M20 grade
What is the difference between EPC,DBOOT and BOOT.
1) One mason per day how many cu.m work will do as per list given a) Brick work,hollow brick work and cc block work and plastering how many m2 per day 2) one carpenter per day how many m2 will do as well as scaffolding how many m3
12 Answers Al-Futtaim, Arihant, GS, Gulf, L&T, NCC, Paras Buildtech, PR Constructions, Ramco,
what is DLC
how many cement and sand required for 1m2 plastering 1:4 cm
per 1 cumt concrete how much manhours is required including shuttring,steel etc.,for slab & foundations
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)