How much Strength of the cube can attain in 7days
comparative 28 days strength?(as per IS code) ( specify the
ref.clause also)
Answer Posted / manoj kumar bhola
AT 7 DAYS STRENGTH WILL BE 67% AND AT 28 DAYS STRENGTH WILL BE 100%
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
where i can get material costs on weekly basis
What is progress payment?
Why the statue of liberty is made of copper?
What Are The Different Type Of Slump Test Indications?
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
how to find ssm in foundation?
what is smart building materials?
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
what is the types of door's wood?
Why should pumping be not used in case of concreting work?
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
what is right & short method of measurement of slab&beam
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet