How much Strength of the cube can attain in 7days
comparative 28 days strength?(as per IS code) ( specify the
ref.clause also)
Answer Posted / palavalasa
7 days = 70%
28 days = 95%
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
What is rate of concrete surface rendering work per sqm
in the earthquqke the profile of water on dam is parabolic or not
is concealed wiring a problem in fly ash brick wall?
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
Differentiate orthographic and isometric projections?
Define polar co ordinates.
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
What is Base Shear ?
what is kribs is supporting?
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
What in your past experience or education prepares you for the position for which you are applying
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?