How much Strength of the cube can attain in 7days
comparative 28 days strength?(as per IS code) ( specify the
ref.clause also)
Answer Posted / palavalasa
7 days = 70%
28 days = 95%
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Can we use concrete of slump cone in cube casting in which we have already measured slump?
What are your future hopes for this job?
what is c4x light weight cement blocks
Minimum concrete cover in slabs, columns, beams, foundation and other st?
what is the hanekom repairing material after concreting work
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
What are the uses of layer?
How to do base isolation for RC framed structure using ETABS software?
What is the minimum size of the particles of silt soil?
Why the finite element method is lower bound solution?