Answer / n.v.ramana
30rmt depending upon the height and site condition.
| Is This Answer Correct ? | 0 Yes | 1 No |
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
For m25 1:1:2 How to get the quantities of cement,sand,agg for 1cu.mt. thnks in advnce
what is the effect of earthquake on rcc columns & foundations?
what"s the difference between fe 415 grade steel and fe 500 grade steel? and which one is mostly used for residential and apartment constructions?
Is there any course for billing available in Mumbai? If yes then please mail me the details..
what mean By core Billing
what is the meaning for 'prime cost' in civil construction contracts?
3 Answers EPPPL, Nagarjuna Construction,
How you Confirm the Hard stratum for Driven cat in situ Pile work?
What is the ideal size of the living room ranges from small to large size?
how much required strength of cement concrete bricks(size 230x115x75mm)
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
What is c.g.i sheet which used for roof??
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)