For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
No Answer is Posted For this Question
Be the First to Post Answer
can any1 mail me IS CODES and quality check sheet of materials..? its urgent plz
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
What height of a 3.5 m high 300 x300 mm proposed col. can be casted at a time ?
how to calculate the lap bar for bor culvert ?
what is the difference between weir and a barrage
12 Answers AAI Airports Authority Of India, CIT, TCI Constructions,
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
material calculations for I st coatplastering 16mm CM (1:5),second coat CM(1;3)4mm thick,pcc(1:4:8),RCC M20,lime stone masonry CM(1:6)
why canot DBM is continue as surface coarse insted of BC? what is dieefrence between DBM & BC?
What is the standard volume of pharma in cub ft
0 Answers Deepa Constructions,
tell me quantitys of matal, sand and cement in 1:4:8 and 1:2:4
9 Answers AVL, Infosys, NCC, SPCL, Swapnapurti Developers,
bridge design
Howmuch bend to be provide for 200/600 BEEM
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)