3,6,13,26,33,66,____

Answers were Sorted based on User's Feedback



3,6,13,26,33,66,____..

Answer / divya

Here v r having 2 series
3,13,33
and
6 26 66
13-3=10
33-13=20
so the next num vll be
x-33=30
x=63
V can say this ans right by considering the sec series also
3,13,33,63 ending didit should b 3

Is This Answer Correct ?    109 Yes 26 No

3,6,13,26,33,66,____..

Answer / rajendra rawat

3
3*2=6
6+7=13
13*2=26
26+7=33
33*2=66
66+7=73
SO ANSWER IS 73

Is This Answer Correct ?    82 Yes 27 No

3,6,13,26,33,66,____..

Answer / barath

separate the series in to 2 parts ..ie
3,13,33
then 2nd sequence will be
6,26,66
the diff btwn no.s in the 1st sequence is 10,20, and so on
diff in 2nd sequence is 20,40, and so on
next no. will be 33+30=63
ans is 63

Is This Answer Correct ?    16 Yes 12 No

3,6,13,26,33,66,____..

Answer / saikrishna

MULTIPLY BY 2 AND ADDITION 7 ALTERNATELY......ANSWER IS 73
3*2= 6
6+7= 13
13*2= 26
26+7= 33
33*2= 66
66+7= 73

Is This Answer Correct ?    4 Yes 2 No

3,6,13,26,33,66,____..

Answer / cnu

3,6,13,26,33,66,____
here we have two series 3,13,33--eq1 and 6,26,66--eq2
by observing both series 1st series is doubled to get second one
eq1)3,13,33 eq2)6,26,66
3+2(pw0)*10=13 6+2(pw1)*10=26
13+2(pw1)*10=33 26+2(pw2)*10=66
33+2(pw2)*10=73 66+2(pw3)*10=146

3,6,13,26,33,66,73,146

Is This Answer Correct ?    11 Yes 13 No

3,6,13,26,33,66,____..

Answer / ramir v. agustin

3+10=13
6+20=26
13+20=33
26+40=66
33+40=73
66+80=146
3,6,13,26,33,66,73,146

Is This Answer Correct ?    4 Yes 12 No

3,6,13,26,33,66,____..

Answer / aadi

3+10=13,13+20=33,33+40=73 so ans is 73

Is This Answer Correct ?    26 Yes 49 No

3,6,13,26,33,66,____..

Answer / cbsrinivas

i think the next is 71
here we have 3,6,13,26,33,66 ok
1st 3+3=6
2nd is 6+7=13
13+13=26(following same order)
26+7=33
33+33=66
so obvioisly the nxt will be 66+7=71

Is This Answer Correct ?    4 Yes 34 No

Post New Answer

More Civil Engineering Interview Questions

Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M hight 3.75 meter 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks

0 Answers  


how to calculate no. of bricks for 1 cft? how to calculate cement and sand in cft?

13 Answers   L&T,


in built up area basis what is ratio of concrete & steel ratio may be consider in per sqft quantity

5 Answers   L&T,


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

0 Answers   IOCL,


Why ss Steel is not using in RCC concrete.

3 Answers   NPCIL,






Are you ready to relocate with your immediate family to United States as a new employee?

0 Answers   L&T,


what is the difference between ribbed steel & tor Steel ?

1 Answers  


07. 4 main points about check list for rebar works are– ––

1 Answers  


what is the cost of per cum of pile foundation?

1 Answers  


How to calculate labor requirement or requirement of labor projction for a proposed multistoried building for which quantities of different items of work has been already calculated stage wise ?

3 Answers  


what is slump

5 Answers   JMC Projects, Puravankara,


Maximum foundation pressure under PRCC box is 19 T/Sqm and net safe bearing capacity is 12.65. Is it safe? pl help me

1 Answers   Indian Railways,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)