3,6,13,26,33,66,____
Answers were Sorted based on User's Feedback
Answer / divya
Here v r having 2 series
3,13,33
and
6 26 66
13-3=10
33-13=20
so the next num vll be
x-33=30
x=63
V can say this ans right by considering the sec series also
3,13,33,63 ending didit should b 3
Is This Answer Correct ? | 109 Yes | 26 No |
3
3*2=6
6+7=13
13*2=26
26+7=33
33*2=66
66+7=73
SO ANSWER IS 73
Is This Answer Correct ? | 82 Yes | 27 No |
Answer / barath
separate the series in to 2 parts ..ie
3,13,33
then 2nd sequence will be
6,26,66
the diff btwn no.s in the 1st sequence is 10,20, and so on
diff in 2nd sequence is 20,40, and so on
next no. will be 33+30=63
ans is 63
Is This Answer Correct ? | 16 Yes | 12 No |
Answer / saikrishna
MULTIPLY BY 2 AND ADDITION 7 ALTERNATELY......ANSWER IS 73
3*2= 6
6+7= 13
13*2= 26
26+7= 33
33*2= 66
66+7= 73
Is This Answer Correct ? | 4 Yes | 2 No |
Answer / cnu
3,6,13,26,33,66,____
here we have two series 3,13,33--eq1 and 6,26,66--eq2
by observing both series 1st series is doubled to get second one
eq1)3,13,33 eq2)6,26,66
3+2(pw0)*10=13 6+2(pw1)*10=26
13+2(pw1)*10=33 26+2(pw2)*10=66
33+2(pw2)*10=73 66+2(pw3)*10=146
3,6,13,26,33,66,73,146
Is This Answer Correct ? | 11 Yes | 13 No |
Answer / ramir v. agustin
3+10=13
6+20=26
13+20=33
26+40=66
33+40=73
66+80=146
3,6,13,26,33,66,73,146
Is This Answer Correct ? | 4 Yes | 12 No |
Answer / cbsrinivas
i think the next is 71
here we have 3,6,13,26,33,66 ok
1st 3+3=6
2nd is 6+7=13
13+13=26(following same order)
26+7=33
33+33=66
so obvioisly the nxt will be 66+7=71
Is This Answer Correct ? | 4 Yes | 34 No |
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M hight 3.75 meter 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
how to calculate no. of bricks for 1 cft? how to calculate cement and sand in cft?
in built up area basis what is ratio of concrete & steel ratio may be consider in per sqft quantity
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
Why ss Steel is not using in RCC concrete.
Are you ready to relocate with your immediate family to United States as a new employee?
what is the difference between ribbed steel & tor Steel ?
07. 4 main points about check list for rebar works are– ––
what is the cost of per cum of pile foundation?
How to calculate labor requirement or requirement of labor projction for a proposed multistoried building for which quantities of different items of work has been already calculated stage wise ?
what is slump
5 Answers JMC Projects, Puravankara,
Maximum foundation pressure under PRCC box is 19 T/Sqm and net safe bearing capacity is 12.65. Is it safe? pl help me