How much quantity of coping is done per day by one mason in
Rmtr?
Answer Posted / n.v.ramana
30rmt depending upon the height and site condition.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
can stub column take the load as main column
how to calculate load bearing column
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
Please tell me vasthu room sizes. Thanks.
quantity of material needed for rubble stone masonry for 1:4 and 1:6
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
how much of the strength comes from post-production curing
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
all technical question
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
How much material will consume for following specification water tank (9*7.5*6 feet)?
What you understand by building codes?
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?