Answer / venkat

column size = 300x300
after removal of cover 40mm two sides=220mm
then, the ring will=((220x4)-(4x2x8)+75)=891mm
4=four corners of ring
for every 90degrees add 2d=2*8
add 75 mm for inner hooks

Is This Answer Correct ?    33 Yes 34 No

What is a BBS?Find out the cutting length for a 300*300 column with 40 mm cover?..

Answer / anilkumar prasad

Answer No 10 is correct

Is This Answer Correct ?    2 Yes 3 No

What is a BBS?Find out the cutting length for a 300*300 column with 40 mm cover?..

Answer / nitin baghel

LET DIA IS 8MM.
SIZE OF RING -
=4(220)+2(10d)-5(2d) means
=2(220)+2(10*8)-5(2*8)
=880+160-80=960mm.

Is This Answer Correct ?    2 Yes 3 No

What is a BBS?Find out the cutting length for a 300*300 column with 40 mm cover?..

Answer / eldridge

960 from my calculations

Is This Answer Correct ?    0 Yes 1 No

What is a BBS?Find out the cutting length for a 300*300 column with 40 mm cover?..

Answer / muzeem khan

given- column size 300x300mm


cutting length of column with cover = 2x300 2x300-4x40
=600 600-160
=1200-160
=1040mm
bending merging of column=
1040-4x8
=1040-32
=1008
size of ring = 1008 2x8x10
=1008 160
=1168mm

Is This Answer Correct ?    0 Yes 1 No

What is a BBS?Find out the cutting length for a 300*300 column with 40 mm cover?..

Answer / muthu selvam

BBS= BAR BENDING SCHEDULE. it use to calculate how much kgs
steel want to building. cutting length of column=880+140=1020mm

Is This Answer Correct ?    4 Yes 8 No

What is a BBS?Find out the cutting length for a 300*300 column with 40 mm cover?..

Answer / santosh deora

cutting length = 2A+2B+24d
A & B inner dimension of stirrup, d dia of bar
for 300x300 column cover 40mm A=B=300-80-16 = 204
d= 8mm
cutting length = 1008

Is This Answer Correct ?    0 Yes 4 No

What is a BBS?Find out the cutting length for a 300*300 column with 40 mm cover?..

Answer / raju rathod

I think Sumit Is Right
Column Cover Is 40mm
One Side Lenght Will be= 300-40=260 not 220 Is wrong

Is This Answer Correct ?    1 Yes 6 No

What is a BBS?Find out the cutting length for a 300*300 column with 40 mm cover?..

Answer / vishal s rao

BBS is Bar Bending schedule
For 300*300 size column
rings will be 300-(40*2)=220mm
220mm on 4sides i.e =880mm
for bending purpose on two end 75mm to be kept.
i.e 880+75+75=1030mm
For right angle 2*d to be added.
i.e 2*8*4=64mm
So totally = 1030+64=1094mm.

Is This Answer Correct ?    14 Yes 22 No

What is a BBS?Find out the cutting length for a 300*300 column with 40 mm cover?..

Answer / n.selvan

let 8mm or 10mm.
col size:300x300 and cover 40mm.
per side 300-(40*2)= 220mm
So 4 side 4*220= 880mm
Add for hook per ring = 50mm
Total length is 880+50= 930mm is sufficient.
This is practical.

Is This Answer Correct ?    1 Yes 9 No

Post New Answer

More Civil Engineering Interview Questions

What is the difference between Extruded and Expanded Polystyrene Sheets?

2 Answers  


How to check slab shuttering level.? Or check list for slab ?

0 Answers  


Dear Friends am S.PRABHU looking for job chnage i have wonderfull exposure to both Construction works & i have a experience 11 years if any found any suitable opening, please Contact 9986539249

1 Answers   Tata Steel Limited,


A beam having top bars 20dia,bottom bars 16 dia.is the design is ok? In which case this applicable?

6 Answers  


how to calculate the size of triangular ring in rcc column?

0 Answers   Prime Perfect Buildcon,






"Why you consider yourself suitable for the post"

17 Answers   Banking, CSE, IIP, IREDA, L&T, Maytas, McHugh, Nations Trust Bank, Teaching, Techkriti IIT Kanpur, Xantium Integrated Solutions,


I am a new valuaer. I am seeking for instruments which r used to locate the site and from where I got it?

1 Answers   Fast,


ratio of sand, cement and metal in all concrete mix

2 Answers  


Explain the mechanism of cavitations in pipes and drains?

0 Answers  


What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?

0 Answers  


What difference comes in constructing of house and a housing complex like society

0 Answers   Sterling Wilson,


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)