What is a BBS?Find out the cutting length for a 300*300 column with 40 mm cover?
Answer Posted / nitin baghel
LET DIA IS 8MM.
SIZE OF RING -
=4(220)+2(10d)-5(2d) means
=2(220)+2(10*8)-5(2*8)
=880+160-80=960mm.
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
where tie beam is used? what is the pupose? what dimension of tie beam can provided and number and diameter of steel bars to be used between the columns of 1333mm and 1400.
How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
how can calculate cutting length of diamond ring
how to take concrete quantity for precast segment for viaduct project?
Why concrete barriers have curved surface profiles?
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
what are the duties of Site Engineer in work site?
pls tell me , what is the water content