What is a BBS?Find out the cutting length for a 300*300 column with 40 mm cover?
Answer Posted / muthu selvam
BBS= BAR BENDING SCHEDULE. it use to calculate how much kgs
steel want to building. cutting length of column=880+140=1020mm
| Is This Answer Correct ? | 4 Yes | 8 No |
Post New Answer View All Answers
Pls explain me about tension and compression in a flat slab
How much material is required for constructing a 2 Lane 2Km rigid pavement road
How to calculate material and labor required for 100 m2 plaster?
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
Explain what are the skills required to become an architect?
Explain the advantages and disadvantages of using plastic and timber fenders?
What is the l/d ratio of cantilever beam?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
Define What are the uses of alloys in daily life and how are alloys made?
how do you calaculate the total steel quantity of an rcc building using thumb rule?
what post do you prefer to work in this company and why do you think you can serve better in such position?
What are the different approaches in designing the floors of the service reservoirs?
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????