What is a BBS?Find out the cutting length for a 300*300 column with 40 mm cover?
Answer Posted / vishal s rao
BBS is Bar Bending schedule
For 300*300 size column
rings will be 300-(40*2)=220mm
220mm on 4sides i.e =880mm
for bending purpose on two end 75mm to be kept.
i.e 880+75+75=1030mm
For right angle 2*d to be added.
i.e 2*8*4=64mm
So totally = 1030+64=1094mm.
Is This Answer Correct ? | 14 Yes | 22 No |
Post New Answer View All Answers
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
Ratio for 4500 psi concrete
How many lbs are there in a yard?
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
as per is code, what is the minimum content of opc and ppc cement for rcc structure
What is the use of offset command?
Explain creep?
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
Why are pull-out tests performed for soil nails?
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
How much is the cover for slab?
how to calculate rate analysys of 1:6 plastering 10 sq m
What are the different softwares used for cad?
How can you distinguish between sorption, absorption and adsorption?