Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is the quantity of formwork in shuttering and
barbending is done by 1 mason and 1 helper

Answers were Sorted based on User's Feedback



what is the quantity of formwork in shuttering and barbending is done by 1 mason and 1 helper..

Answer / rajesh n s

Shuttering/Formwork Workdone by 1 Carpenter + 1 helper is 5 to 7 Sqm / day
Barbending by 1 Barnender + 1 Helper is 80 to 100 kg / day

Is This Answer Correct ?    37 Yes 5 No

what is the quantity of formwork in shuttering and barbending is done by 1 mason and 1 helper..

Answer / rajarshi basu

can u prove it technically how it is coming....or it is just based on site exp...

Is This Answer Correct ?    3 Yes 0 No

what is the quantity of formwork in shuttering and barbending is done by 1 mason and 1 helper..

Answer / kamal mukherjee

Is the question technically correct ? General terminology of shuttering workmen is carpenter and steel fixer ins bar bender .
Again the output is linked to the type of the structure in execution.
Broadly Classified as : Sub structure or Super structure
Detailed Classification: Footing, Raft , Column, beam , slab , decorative work: Cantilever, loft, projection works etc..
general working is 2.5-3 sqm of shuttering and 700-750kgs for bar bending works for a pair of workmen

Is This Answer Correct ?    8 Yes 7 No

what is the quantity of formwork in shuttering and barbending is done by 1 mason and 1 helper..

Answer / tarini

1.25

Is This Answer Correct ?    5 Yes 10 No

Post New Answer

More Civil Engineering Interview Questions

whatis the minimum strength required for M-25 grade concrete in 14days compressive test? What is the procedure of calculation?

1 Answers  


Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?

0 Answers   Amit Enterprises, ICT,


how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?

0 Answers  


Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40

10 Answers   ACC, Awasthi Construction, Bitulink, Mir Akhter Hossain, SOT,


the building construction what type of equipments are used in site and its purpose?

1 Answers  


what will be the lap length of column reinforcement in case of welded lap

2 Answers  


what is periode of deshuttering of slab our span length 21m,and width 2.5m grade of concrete M-35

3 Answers  


what is the quantity of formwork in shuttering and barbending is done by 1 mason and 1 helper

4 Answers   CPWD,


What things architect have to take care of before starting any project?

0 Answers  


concrete mix design for M 30 Grade

1 Answers  


How much percentage of silt contain maximum allowed?

5 Answers   ACC,


at which depth the construction of tunnel is economical from cost and engineering aspect.

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)