what is the quantity of formwork in shuttering and
barbending is done by 1 mason and 1 helper
Answers were Sorted based on User's Feedback
Answer / rajesh n s
Shuttering/Formwork Workdone by 1 Carpenter + 1 helper is 5 to 7 Sqm / day
Barbending by 1 Barnender + 1 Helper is 80 to 100 kg / day
| Is This Answer Correct ? | 37 Yes | 5 No |
Answer / rajarshi basu
can u prove it technically how it is coming....or it is just based on site exp...
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / kamal mukherjee
Is the question technically correct ? General terminology of shuttering workmen is carpenter and steel fixer ins bar bender .
Again the output is linked to the type of the structure in execution.
Broadly Classified as : Sub structure or Super structure
Detailed Classification: Footing, Raft , Column, beam , slab , decorative work: Cantilever, loft, projection works etc..
general working is 2.5-3 sqm of shuttering and 700-750kgs for bar bending works for a pair of workmen
| Is This Answer Correct ? | 8 Yes | 7 No |
whatis the minimum strength required for M-25 grade concrete in 14days compressive test? What is the procedure of calculation?
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
0 Answers Amit Enterprises, ICT,
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
10 Answers ACC, Awasthi Construction, Bitulink, Mir Akhter Hossain, SOT,
the building construction what type of equipments are used in site and its purpose?
what will be the lap length of column reinforcement in case of welded lap
what is periode of deshuttering of slab our span length 21m,and width 2.5m grade of concrete M-35
what is the quantity of formwork in shuttering and barbending is done by 1 mason and 1 helper
What things architect have to take care of before starting any project?
concrete mix design for M 30 Grade
How much percentage of silt contain maximum allowed?
at which depth the construction of tunnel is economical from cost and engineering aspect.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)