what is the quantity of formwork in shuttering and
barbending is done by 1 mason and 1 helper
Answers were Sorted based on User's Feedback
Answer / rajesh n s
Shuttering/Formwork Workdone by 1 Carpenter + 1 helper is 5 to 7 Sqm / day
Barbending by 1 Barnender + 1 Helper is 80 to 100 kg / day
Is This Answer Correct ? | 37 Yes | 5 No |
Answer / rajarshi basu
can u prove it technically how it is coming....or it is just based on site exp...
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / kamal mukherjee
Is the question technically correct ? General terminology of shuttering workmen is carpenter and steel fixer ins bar bender .
Again the output is linked to the type of the structure in execution.
Broadly Classified as : Sub structure or Super structure
Detailed Classification: Footing, Raft , Column, beam , slab , decorative work: Cantilever, loft, projection works etc..
general working is 2.5-3 sqm of shuttering and 700-750kgs for bar bending works for a pair of workmen
Is This Answer Correct ? | 8 Yes | 7 No |
lap lenth
polavaram project is situated inwhich place?
How much steel required for only ground floor of 1600 Sq foot.Having general structure ?
why cylinder for split tensile strength test ?
how to convert sand from Cum to Brass
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
What is Critical path in Ms-Project ?
what is meant by VDF FLOORING? why it is used?
differance bet QA & Qc
What is the procedure of Waterproofing in toilet sunken area ?
How to calculate material requirement for 230mm thick, 1 sq.m brick masonry?
WHAT IS THE RATIO OF CEMENT:SAND:COARSE AGGREGADE IN M-20, M-25, M-30, M-35, M-40, M-45, M-50 CONCRETE?