what is the quantity of formwork in shuttering and
barbending is done by 1 mason and 1 helper
Answer Posted / kamal mukherjee
Is the question technically correct ? General terminology of shuttering workmen is carpenter and steel fixer ins bar bender .
Again the output is linked to the type of the structure in execution.
Broadly Classified as : Sub structure or Super structure
Detailed Classification: Footing, Raft , Column, beam , slab , decorative work: Cantilever, loft, projection works etc..
general working is 2.5-3 sqm of shuttering and 700-750kgs for bar bending works for a pair of workmen
Is This Answer Correct ? | 8 Yes | 7 No |
Post New Answer View All Answers
Which stone is best for wall construction Laterite Stone or Cement Blocks
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
Explain major differences between routing maintenance and major maintenance.
What are the common ways of demolition?
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
Minimum concrete cover in slabs, columns, beams, foundation and other st?
how to do sudoko puzaals?
How to calculate plastering for elevated water storage tank
How to find out kg per Sft ?
How many square meter can a worker/labor demolish a structure per day?
Basic civil interview questionsÂ
How many types of slabs are there & how to design it?
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
What are the techniques to measure road difference?