what is the quantity of formwork in shuttering and
barbending is done by 1 mason and 1 helper
Answer Posted / kamal mukherjee
Is the question technically correct ? General terminology of shuttering workmen is carpenter and steel fixer ins bar bender .
Again the output is linked to the type of the structure in execution.
Broadly Classified as : Sub structure or Super structure
Detailed Classification: Footing, Raft , Column, beam , slab , decorative work: Cantilever, loft, projection works etc..
general working is 2.5-3 sqm of shuttering and 700-750kgs for bar bending works for a pair of workmen
| Is This Answer Correct ? | 8 Yes | 7 No |
Post New Answer View All Answers
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
i have span of 6m x 4m how do i calculate the reinforcement of steel i needed and to at what distance and also the thickness of slab. looking forward thank you RAVI
1:4:8 pcc calculation 591 cu.ft
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
I need old MMUP exam question and answer for Civil engineering
Which purpose we use deck anchor in bridges?
why is the column design?
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
what is parametre for M25 after 7 days strength
Why is concrete cube test carried out?
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
What is the tensile strength of wood?
could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!
What is the tallest man made structure in the world?
how many type of admixtures for water stored structure?