what is the quantity of formwork in shuttering and
barbending is done by 1 mason and 1 helper

Answer Posted / kamal mukherjee

Is the question technically correct ? General terminology of shuttering workmen is carpenter and steel fixer ins bar bender .
Again the output is linked to the type of the structure in execution.
Broadly Classified as : Sub structure or Super structure
Detailed Classification: Footing, Raft , Column, beam , slab , decorative work: Cantilever, loft, projection works etc..
general working is 2.5-3 sqm of shuttering and 700-750kgs for bar bending works for a pair of workmen

Is This Answer Correct ?    8 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which stone is best for wall construction Laterite Stone or Cement Blocks

1310


Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com

1537


Explain major differences between routing maintenance and major maintenance.

653


What are the common ways of demolition?

713


how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?

1337






Minimum concrete cover in slabs, columns, beams, foundation and other st?

666


how to do sudoko puzaals?

1831


How to calculate plastering for elevated water storage tank

818


How to find out kg per Sft ?

1800


How many square meter can a worker/labor demolish a structure per day?

1515


Basic civil interview questions 

1856


How many types of slabs are there & how to design it?

762


How much area will be covered in 1 litre of Velvet touch paint in normal wall condition

945


If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?

1259


What are the techniques to measure road difference?

756