what is the quantity of formwork in shuttering and
barbending is done by 1 mason and 1 helper
Answer Posted / kamal mukherjee
Is the question technically correct ? General terminology of shuttering workmen is carpenter and steel fixer ins bar bender .
Again the output is linked to the type of the structure in execution.
Broadly Classified as : Sub structure or Super structure
Detailed Classification: Footing, Raft , Column, beam , slab , decorative work: Cantilever, loft, projection works etc..
general working is 2.5-3 sqm of shuttering and 700-750kgs for bar bending works for a pair of workmen
| Is This Answer Correct ? | 8 Yes | 7 No |
Post New Answer View All Answers
How is the leaning tower of pisa supported?
how much cement and sand required for 1cum rr masonry
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
What is the basic difference between OPC
How you can use different dimension tools in cad? What are the different dimensions available?
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
can stub column take the load as main column
What is GSB gradation
what is the Asfalt test?in road constraction..?
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
What are the important hardware systems used for cad?
how many BSCs can i connect to the HUAWEI MSC
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?