what is the quantity of formwork in shuttering and
barbending is done by 1 mason and 1 helper
Answer Posted / rajesh n s
Shuttering/Formwork Workdone by 1 Carpenter + 1 helper is 5 to 7 Sqm / day
Barbending by 1 Barnender + 1 Helper is 80 to 100 kg / day
| Is This Answer Correct ? | 37 Yes | 5 No |
Post New Answer View All Answers
why is M30 grade Concrete use for Foothing & Column M50
punj loyed and sapurjl palanjl
How much material is required for constructing a 2 Lane 2Km rigid pavement road
need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
What happens to Load at yielding ?
Consumption of Binding wire for fixing of cover block in vertical surface
What is command line?
What are new methods /technologies of pothole patching?
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
How good are the Weinerberger Porotherm bricks that are being used in construction in Chennai, India. Its being used in non load bearing walls and has a compressive strength greater that 35 kg/cm^2 and a density of approx.694 - 783 kg/m3.
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
What are the different softwares used for cad?