what is the quantity of formwork in shuttering and
barbending is done by 1 mason and 1 helper
Answer Posted / tarini
1.25
| Is This Answer Correct ? | 5 Yes | 10 No |
Post New Answer View All Answers
how to take concrete quantity for precast segment for viaduct project?
What are segregation and bleeding?
What is the absolute pressure scale?
What is unit weight of normal concrete?
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers
to draw bm diagrams for portal frames under different loadings//
what is the difference between replacement of cement by groundnut shell ash
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
What year was the keystone power plant in Indiana County constructed?
At what point does a circle start losing area when being flattened?
What are the techniques to measure road difference?
what is the clear cover for shearwall?
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?