Answer / enayatullah mahroowal
0.36 skilled and 2 unskilled labour is enough form onc cum
concrete
| Is This Answer Correct ? | 24 Yes | 7 No |
Answer / sathesh.b.nama
3CUM/DAY/ MASON WITH 1 HELPER CAN DO RCC & 5CUM/DAY/MASON WITH 1 HELPER CAN DO PCC..IS NORMAL PRODUCTIVE NORMS OFA A MASON NOW-A-DAYS
| Is This Answer Correct ? | 12 Yes | 6 No |
Answer / mkg
a gang of 18 labour is required at a mixer machine for rcc work.
| Is This Answer Correct ? | 7 Yes | 11 No |
Answer / chandu
Around 2 Mason and 1.5 helper per 1 cum concrete
| Is This Answer Correct ? | 2 Yes | 21 No |
what"s the formula find the cement consumption for brick work 23 thick wall 1 m3?
7 Answers L&T, Vipul Chemicals,
Why we use pcc in foundation?
what is the formula to calculate isolated footing
the moisture content of the soil below which the soil volume becomes constant ie called liquid limit plastic limlt shrinkage limit none
How is improve my knowledge in construction industries....
how 2 find out slap steel quantity ? plz help me
What is absolute coordinates?
Define What is the meaning of a blue land surveyors flag?
why we use minimum cement as given in IS mix design code
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
for 100sft of Cement plastering ratio 1:6 How much quantity of cement and sand required.
6 Answers J.K. Organization, L&T,
how to decide the column size and dia of the bar
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)