Answer Posted / enayatullah mahroowal
0.36 skilled and 2 unskilled labour is enough form onc cum
concrete
Is This Answer Correct ? | 22 Yes | 7 No |
Post New Answer View All Answers
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
strength vs shape factor
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
Can we apply curing compound on ceiling (slab Bottom)
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
how many BSCs can i connect to the HUAWEI MSC
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
What is the purpose of Chipping in the heavy foundation?
how we calculate the grade of the Bituminous materials.?????
How to calculate chejja reinforcement
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
What is difference between engineering stress and true stress?
how to check and keep control on the wastage of material at site