how many labour is required for 1cum of concrete?

Answer Posted / mkg

a gang of 18 labour is required at a mixer machine for rcc work.

Is This Answer Correct ?    7 Yes 11 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?

1261


What is the difference between Hinged and pinned in Column ends

4782


Define What materials were used to build the Golden Gate Bridge?

639


What is the standard volume of pharma in cub ft

1287


What is limit state method and working stress method and ultimate method

1134






what is SDLC ?and write a 'c'program for to swapping the three numbers?

1393


What are moment of inertia and its importance in civil engineering?

696


Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai

2581


how do you stabilize a waterlogged area in road construction

6304


primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above

1640


What is the strongest bridge for a school contest?

712


Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?

1646


Would you cause a 55-gallon drum of water to weigh more by climbing in?

675


Which is the best book for building construction?

648


How to calculate plastering for elevated water storage tank

820