Answer Posted / mkg
a gang of 18 labour is required at a mixer machine for rcc work.
| Is This Answer Correct ? | 7 Yes | 11 No |
Post New Answer View All Answers
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
what is the 0 value in quantity surveying
What happens to Load at yielding ?
Which tests are performed on soil to decide the type of foundation to be provided.
on what basis the partial factor of safety are decided? form the load combinations
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
What is gravity flow?
Sir how to find cutting length for footing steel bars in the shape of "u"
Why should appointment store person for project ? what is the benefits for company ?
Which is the direction of negative angle?
Explain major differences between routing maintenance and major maintenance.
What is the withdrawal force of steel nails?
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
How much is the cover for slab?