What is the least count of Theodalite survey?
Answers were Sorted based on User's Feedback
Answer / akshaya
The least count of Theodalite survey is about
10 second to 20 second.
Least count is the difference of the samllest value of main
scale to vernier scale.
| Is This Answer Correct ? | 6 Yes | 2 No |
What is the quantit;(pratical method) of cement, sand, and gravel to be used in M25 grade of concrete for 1000 x 1000 x 1000 mm of sand (for cement please mention in kilos, and for sand and gravel please mention in cuft
What is the weight of 10mm,20mm,40mm aggregate per cubic
What is the maximum strength of cub compress strength in one cub testing
Define What happens to Load at yielding ?
Can we use 16mm dia bar in place of 12mm dia bar in COLUMNS? (if given dia bar is not available on site)
What is the strongest bridge for a school contest?
Which is beneficial for shuttering a Plywood os accrow plate & why ?
What are some structures that are subjected to fatigue?
How to decide/consider the grade of bitumen for dbm.
What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?
tensile strength of shuttering ply wood=?
how to calculate cement coefficient for 20mm thick vitrified tiles flooring with cm 1:4 with explaination
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)