What is the least count of Theodalite survey?
Answers were Sorted based on User's Feedback
Answer / akshaya
The least count of Theodalite survey is about
10 second to 20 second.
Least count is the difference of the samllest value of main
scale to vernier scale.
| Is This Answer Correct ? | 6 Yes | 2 No |
How can we find out the clear cover for a circular ring and rectangular ring..
Explain what are the phases inspections are done by local authority while construction?
where the corner reinforcement be placed in the rigid road pavement? can it be placed below the bottom main bar of double netting pavement?
how to calculate rate analysis of M25 grade concrete
8 Answers Nagarjuna Construction, Simplex,
WHICH KIND OF ADDITIONAL PILE DRIVEN TO INCREASE THE CAPACITY OF SUPPORTING LOADS ON VERTICAL PILES
How you can use different dimension tools in cad? What are the different dimensions available?
how to calculate unit weight cement ,water ,steel
for a tachometer the additive & multiplying constant are 0 & 100 100 & 0 0 & 0 100 & 100
Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
How much time Required for PPR pipe network testing
say the propotions of different concrete mix desidn(M20 M15 M25 M25 M30)
which has high coefficient of discharge venturimeter or orificemeter
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)