What is the least count of Theodalite survey?
Answers were Sorted based on User's Feedback
Answer / akshaya
The least count of Theodalite survey is about
10 second to 20 second.
Least count is the difference of the samllest value of main
scale to vernier scale.
Is This Answer Correct ? | 6 Yes | 2 No |
Define What is diversion tunnel in a dam?
Give open excavation details of Building.
Plese tell me about cranked beam (end hook lenth, crank angle, crank length). Thanks.
what is the % wastage of cement in rcc
what is design life of steel structures??
How to calculate the sand and aggregate in concrete
Why should appointment store person for project ? what is the benefits for company ?
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
What is the soil bearing capacity ? And how it should be to built a multistory building ?
3 Answers Clancy Networks, eConstruct, UltraTech,
what is difference between footing and foundation?
what is the weight of wet concrete?
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?