what is the size of ur oraarchieve directory? how can u
prevent archiver stuck situation?
Answers were Sorted based on User's Feedback
Answer / chandra sekhar
Every day we have to take backup of archieve logs in the archieve director.through db13 select online redologs and -sd
,it means that the system copy the online redo logs to backup folder and delete the logs from archieve directory.
go to oraarch directory and type du -sh in linux.it shows the size of directory.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / chandra sekhar
we take backup of logs everday from archieve directory from db13 there only we select an option called -sd it means save and delete.if u not perform this action.the archieve directory size will increase and finaly archieve struck will happen,then u have to delete the logs from the archieve directory.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / s.m.feroz ahmed
Hi,
OraArchive directory will be of more than 17gb and one can
prevent arceiver stuck situation with the help of T
Code "SARA" in SAP.Transaction Code "SARA" is used to check
both archive directory and logs and to prevent stuck
situation.
Is This Answer Correct ? | 1 Yes | 3 No |
i am working with NBFC- MNC in personal loan dept. I applied for Internal Job Position in banking Division. My overall (10 years) experience in sales and People Management and in Internal Job Posting they require person for backend activity. There will be not repotees and its individual performance job. My Question is 1. If they will ask why you want to change your field form sales to backend job what should I answer? 2. The opening is in Chennai and since 10 year I am in Gujarat so if they ask why you want to change your home town location? Arpan Thakkar
Explain checkpoint?
User has scheduled a Background Job, he wants that background job to run faster. How to speedup the background job process?
In operation modes i have schedule some jobs in off peak but the jobs are not completed with in time of off peak what happen at this time whether they wait until jobs complet or change to peak mode ? off peak time interval is from 6.0 pm to 6.0 am and peak time interval is from 6.0 am to 6.0 pm
Hi, Cansomeone please send the system refresh doc , it's very urgent for me. Thanks in advance.
List the types of transport requests?
If i want to increase Dialog WP in process what is the procedure to increase the Dialog WP?
Explain the system trace?
what is the differ between 4.7EE and ECC5.0?
How do you handle the update failures?
What are the errors you got while applying support pack?
What is the database backup strategy?