the amount which paid to contractor before starting work.
what does it calls?
Answers were Sorted based on User's Feedback
Answer / n. makesh
Mobilization advance which will be deducted in running bill
Is This Answer Correct ? | 13 Yes | 1 No |
Answer / dheeraj singh
Mobilization advance which will be deducted in running bill
as per norms of Contract, as per prorata basis (complete
recover upto of work completion 80%), we will deduct %of
Givin/80 for example, M.A.-10%, than recoverable
amount=10/80=12.50%
Is This Answer Correct ? | 5 Yes | 0 No |
Answer / sisir kumar behera
Mobilization advance which will be deducted in running bill
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / sundarapandiyan
"Mobilization advance" which is the contractor must utilize to mobilize the required resources to gear up the progress from initial stage.
Is This Answer Correct ? | 0 Yes | 0 No |
Building construction
What is the difference between Stress & Strain?
how the lap length is calculated in reinforcement of 110mm dia steel of Length 15.00 mtrs. & grade of concrete is M20
Detection of a beam & a girder areββββ
The point of contraflexure occurs in
how to calculate the amount of cement & sand required for plastering
What do you mean by the word 'shear'?
what is Brick crushing strength(PSI)?
which grade of cement is more suitable for construction..? and why.?? what is difference between 33, 43 and 53 grade cement..?
How to find the thickness of RCC concrete ex.10'x10'. what"s the thickness, we provide and what"s the formula?
What"s mean by term of BOQ in construction?
13 Answers Jaypee, Shaarc Projects, Xerox,
What is the strength of 150x150mm cube compared to 300x300mm concrete cube?? Why?