Whr should a joint be located in a beam if the provision of
a joint is unavoidable??
Answers were Sorted based on User's Feedback
Answer / sagar
near the minimum shear force zone is the most suitable section
for the joints.
| Is This Answer Correct ? | 4 Yes | 1 No |
how to control PQI (Project Quality Index)
why we provide plastic sheet under lean concrete/pcc.?
how to calculate the strength of rebound hammer test reading in building construction ?
What is the finess modulus of sand?
what are the CAD software versions you have used?
12 Answers ERA, IES,
why in india readymade structure is impossible in residence houses?
what is the MSL?where is it located?
2 Answers C-Tech RC Design, Era Infra Engineering, IVRCL,
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
I dont know english very well to speak,in interview if they ask to introduce yourself means how to answer in english?
What is the development length given in pile?
is there any books available to know the methodology of construction process ( Site Process ) and also find the quantities of all materials used at site.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)