What is the zero value in quantity surveying
No Answer is Posted For this Question
Be the First to Post Answer
i know that, the for calculating material required for concrete volume of concrete is taken 50-54 % more for wet volume. i have querry is that cement and sand volume taken more for making wet volume but in the case of aggregate why it is taken more there is no change in aggregate whether it is dry or wet.???? can you give me answer for this???
If drainage is main things then which respect the super Elevation may be provided?
Distinguation between Developing Length and Lapping Lengh
WHAT IS NON DESTRUCTIVE TEST?PLEASE GIVE ME THE PROCEDURE?
What is difference between nominal mix and design mix?
what is porosity??
How to calculate water cement ratio in mix desion
the bubble tube parallel to the telescope of theodolite should be more sensitive since it controls a. vertical axis b. horizontal axis c. axis of bubble tube d. none of this
What is the unit weight of cement?
what is minimum reinforcement required for rcc works
what are IS code for M20, 25, etc
40 Answers Aarvi Encon, Best Builders, L&T, NCC, PWD, RNS, Vardhman,
15mm thick plastering 1:4 what is the cement consumption per sqm
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)