What is the zero value in quantity surveying
No Answer is Posted For this Question
Be the First to Post Answer
rate analysis,what is PERT, TMT ,UPVC
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
What applicable rate of wct in bihar
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
If i buy some material and the seller asks me my TIN number what does that mean?? Is it my Taxpayers Identification number or it is my Tax invoice number? What does both of these stands for???
how the find the quantity of water used to make 1 cubic meter concrete mortor
Why are steel plates inserted inside bearings in elastomeric bearings?
Describe the role of independent Quantity surveyor?
One unit equal to how many brick
3 Answers Sainath Infrastructure,
Any bopdy tell me how to prepare rate analysis for Centering and shuttering for RAFT FOUNDATION, SUSPENDED FLOORS, STAIR CASES, RETAINING WALLS, SHEAR WALL and COLUMNS
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
please know me that required quantity of cement , sand , water and bricks for 1 cub meter of brick work
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)