the amount which paid to contractor before starting work.
what does it calls?
Answer Posted / sisir kumar behera
Mobilization advance which will be deducted in running bill
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
What is bmc stands for in bmc software?
How to do base isolation using ETABS software?
Form where IS456 is adopted in 1978?
what is the permanent solution applied for restoration of leaning tower of pisa?
rate analysis hiring of generator 62.5 KVA
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
Mention what are the composition of a landfill?
What is horizon or horizontal mining?
How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?
What is thumb rule for deep trench excavation
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
What are the different methods for drawing an arc?
why we can use dust in concrete insted of fly ash