the amount which paid to contractor before starting work.
what does it calls?
Answer Posted / kumar
Mobilization advance
Is This Answer Correct ? | 18 Yes | 1 No |
Post New Answer View All Answers
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
How much cement,sand,bricks and water needed for 1square metre brick work?
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1
In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?
How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?
what is the meaning of degreasing of the euipment or line.
For the construction project what capital cost has to be taken in consideration?
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
Define Who designed the city of Washington DC?
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
What is pre-stressed concrete?