Contrete reaches its full strength in 28 days. Then, why
are we removing shutter in 7/ 14 days?
Answer Posted / saif raza
As deshuttering period is desrcibe in IS code for diffrent
structural member.
for deshutering purpose minimum strength required is
between 65 to 75% & concrete gain more then 65% atseven
days so it is safe to remove.
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
Are cruise ships built for the transatlantic run?
How to find out slope footing concrete
How to calculate paint drums per meter square
which method is used in semi-rigid connection design??
how many shuttering material required for 1000 sq.m built up area.
Water filter calculation formula
hi guys what happens if you are absent for a supplymentry exam?
why we use aggregate,sand with cement in concrete?
What is the cost difference between site mix and ready mix concrete per cubic meter
Which percentage of carpet area use in plot area of office building.
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
how to caluclate sienerge qty in construction in ap
I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent