Contrete reaches its full strength in 28 days. Then, why
are we removing shutter in 7/ 14 days?
Answer Posted / ankit
concrete achive its full stenghth in 28 days.while minimum
strength accrd. IS CODE is 7day strngth.
in field where the cost of construction is low,
shuttering / formwork is many a times removed even after
two to three days.only intial strenght matters.
| Is This Answer Correct ? | 6 Yes | 8 No |
Post New Answer View All Answers
detailed calculation of the amount of cement used?
How much for the BRC lapping in full yield and half yield < and which table to get it ?
how to calculate the chair reinforcement length in slabs, footing or anywhere??
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
how to tie 10 legged stirrups
what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.
What is the difference between 53 grade and 43 grade cement
How to find out slope footing concrete
What is Gsb tollens ?
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
What is the difference between absorption & adsorption and sorption?
Are cruise ships built for the transatlantic run?
five benefits of using standard terminology in the measurement process
how to calculate rate analysys of 1:6 plastering 10 sq m
What is the outturn of Ceiling plastering