Contrete reaches its full strength in 28 days. Then, why
are we removing shutter in 7/ 14 days?
Answer Posted / ankit
concrete achive its full stenghth in 28 days.while minimum
strength accrd. IS CODE is 7day strngth.
in field where the cost of construction is low,
shuttering / formwork is many a times removed even after
two to three days.only intial strenght matters.
| Is This Answer Correct ? | 6 Yes | 8 No |
Post New Answer View All Answers
Dear Sir I Mahesh C. Bhamre have already given a Exam for Superintendent Officer / Public relation Officer Exam Dharmday Aaukta held at Nashik on Date 29/08/2010. My seat no was 5040247. and my cell no is 9822677994. and my mail Id is - mahesh.bhamre@rediffmail.com So can you pl send me details of result of respective exams. Thanking you in Anticipation.
What are the benefits of rcc pipes over steel designed pipes?
What is the release of lien?
significance of specific surface area of particles?
What is labor and material payment bond?
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
What is a bearing capacity of soil?
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
Where is the worlds longest elevator and how long is it?
What ingredients with% found in ppc cement??
may i know the detailed description of cutting length
Coverage of 25mm.thick ratio of 1:4 cement mortar?
How do you change a dimension value in solidsworks?
How much quantity of rod binding work by a rod binder per day