Contrete reaches its full strength in 28 days. Then, why
are we removing shutter in 7/ 14 days?
Answer Posted / ankit
concrete achive its full stenghth in 28 days.while minimum
strength accrd. IS CODE is 7day strngth.
in field where the cost of construction is low,
shuttering / formwork is many a times removed even after
two to three days.only intial strenght matters.
| Is This Answer Correct ? | 6 Yes | 8 No |
Post New Answer View All Answers
Difference between lime, distemper and plastic emulsion?
what is differences between ferrock and concrete ?
What are the applications of modulus of elasticity?
what is project?
What are the skills required to become an architect?
What is high adherence steel bar? I have a general specification which refers to High Adherence steel bars, coils and meshes to BS EN 10080 and BS 4449 or BS 4483. Is this just general re-bar or is there something different about it? The spec originated in France.
What are the common ways of demolition?
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
Slump Values for works?
How much material will consume for following specification water tank (9*7.5*6 feet)?
How to calculate woden area in sft and Cft
Which is the most prominent tower of world?
How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water