Contrete reaches its full strength in 28 days. Then, why
are we removing shutter in 7/ 14 days?
Answer Posted / m.haseeb yaquobi
becuase it reache more then 50% of its full strenght
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
Difference between pre-tensioning and post-tensioning.
When column of building is abutting the boundary line,then suitable footing advised is
How does a traffic light signal work ?
What is geopolymer based concrete?
What is fineness modulus ? and its sieve # ?
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
What is the largest concrete dam in the world?
what is the calculation of raw material for 0.35cum of m-15
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
length where bent up is made in slab of bridge from one end
what is column foundation
What is Curtailing of R/F
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
what is total volume of ingredients used in concrete accordingly
2nd and 4rt angle elevation used in which country ?