How you read 5x3x1 #4 @ 20" 0/C in steel structure?
No Answer is Posted For this Question
Be the First to Post Answer
important question on stones
the amount which paid to contractor before starting work. what does it calls?
what is plum & mass concrete?
What are the different methods for drawing an arc?
Method of findingthe dry ingredient quantity of 1 m3 concrete.
25 Answers Annai Infra Developers, GKC Projects Limited GKCPL, IRE, L&T, Mahle Filter Systems, NCC, PNRD, Rama, RCC, Shivani Agriculture, Sobha Developers, Suraj Constructions, TCL,
Materials datas like cement sand steel brick 20&40mm aggregate required per sqft of building?
Why we provide chair for slab reinforcement? How to place chair distributors to distributors or top distributors to bottom main?
How many steel is require in one sqft area?
17 Answers L&T, XYZ,
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
Difference between wbm and gsb in road construction
4 Answers CPWD, GSB, Ircon, JMC Projects, L&T, RD,
how to find quantity of concrete in PCC M15
what is the difference between sill beam,Tie beam and plinth beam?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)