Contrete reaches its full strength in 28 days. Then, why
are we removing shutter in 7/ 14 days?
Answer Posted / mhbkpr
We cannot deshutter in all type of concrete works. for e.g
footing, plinth, beam sides like we can remove within this.
But roof slab likes we need provide back proping before
removing.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
.5Ast
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure
Which IS Code/American Code applied for coupler test of steel
Why should pumping be not used in case of concreting works?
What black man invented the clothes dryer?
What is an ortho mode?
what is the effect of duration of earth quake on framed structures ?
What is difference between limit state and working stress method? How it is applies in building structure.
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
Sir how to find cutting length for footing steel bars in the shape of "u"
WHAT DLC DESIGN IN CONSTRUCTION
Explain the mechanism of cavitations in pipes and drains?
Define What is aggregate?