Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Contrete reaches its full strength in 28 days. Then, why
are we removing shutter in 7/ 14 days?

Answer Posted / v.kapil

Concrete get its 50 % strength in 3 days and 66.6% in 7 days
with OPC grade of cement, we designed our structure for
full load including of factor of safety but actually such
loads never come structure in its whole life span, only 40-
50% loads ware accoured during construction so we can
remove our form work after 7-10 days but after confirmation
of cube results of 7 days.

Is This Answer Correct ?    15 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is idealized curve for concrere and steel

2408


For making a new road in a village having a school & hospital , tell the steps of construction systemically ?

1705


What is the substitute of Mastic Asphalt?

8221


What is Critical path in Ms-Project ?

1253


How much cement and water required for cement selery????

2053


will fix foundation bolts at site with out template is there any procedure?

2694


How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)

2300


Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.

2155


for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area

2397


WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10

2756


Pls help me to arrive the rates for centering shuttering for highbay using H-frames?

2416


how to calculate number of bitumen for road asphalt

1603


How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?

2065


Is there any course for billing available in Mumbai? If yes then please mail me the details..

2294


Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in

2601