When, how and how would you control changes to standard SAP
objects.
No Answer is Posted For this Question
Be the First to Post Answer
create a Report to print Stock & Valuated Stock for Plant (ALV Grid) Selection Screen Ranges: Material Number (MARA-MATNR) Material Type (MARA-MTART) Valuation Class (MBEW-BKLAS) Storage Location (MARD-LGORT) Parameter filed plant (MARD-WERKS) Selection condition: Total valuated stock – MBEW-LBKUM – should be greater than zero Table to be used MAKT,MARD,MBEW,MARA,T001L.. (Use inner joins) Display output: Storage location: (TOO1L-LGORT) Description (T001L-LGOBE) Material No (MARA-MATNR), Material Description (MAKT- MAKTX), Total valuated stock (MBEW-LBKUM), Val of tot valuated stock (MBEW-SALK3), IF MBEW-VPRSV = 'S'. Price – MBEW-STPRS ELSEIF DTAB-VPRSV = 'V'. Price – MBEW-VERPR. ENDIF. Subtotal of Total valuated stock (MBEW-LBKUM), Val of tot valuated stock (MBEW-SALK3), Grand Total of Total valuated stock (MBEW-LBKUM), Val of tot valuated stock (MBEW-SALK3), In the ALV grid display keep a button in the tool bar which on clicking navigates through the screen to the next grid which displays the grand total. Use SET PF_STATUS which is in the FM reuse_alv_grid_display to set the button.
9) We give KEEP in BDC structure...what is its purpose?
There is a Database Table of Student Details with Fields Student Id, Student Name, Class ID and Rank. Now how to fetch the first three students with highest ranks from all Classes.
in report gui we are giving customer number if it is wrong entry then how to write the code to restrict wrong entry?
could u plz provide me the details of blue printing? Role of an abapper in implementation project? Details steps of implementation? Regards, Rahul
How to find out the no of implementations done for a badi
CAN WE DEBUG A IDOC? IF YES HOW TO DEBUG IN INBOUND SIDE AND OUTPUT SIDE.
I want some questions in SAP -ABAP,programming side
What is the difference between pnp and pnpce? : abap hr
how to write code alv with interactive?when i clicked 1field i will generated next-level report,is it possible in alv?
1.If there is one receiver,then To send 10 materials at a time through BD10 tcode, How many Master Idoc create? 2.If there is one receiver,then To send 1 material at a time through BD10 tcode, how many Master Idoc generated? 3.Can I Send Multiple Messges through BD10 tcode?
u r running a report .it is taking a long time for execution .what steps will u do to reduce the execution time?
4 Answers Bristle Cone, Cap Gemini, HP, Satyam, Wipro,