how much binding wire is required for one tone steel
Answer Posted / prashanth
6 to 7.5 kgs/tonne
| Is This Answer Correct ? | 15 Yes | 6 No |
Post New Answer View All Answers
What is quantity of cement and sand required for 2000sqft of tiling?
How did the romans get water up hills using aqua ducts?
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
Design a rectangular channel.
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
Basic questions of civil engineering
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
Explain the different types of building contracts?
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
Define absolute co-ordinates?
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
Define What are the materials used in building a gravity dam?
load combinations how many types for staad design purpose?