how much binding wire is required for one tone steel
Answer Posted / muthuraj s
Approximately 7kg/MT in my site Gammon India Ltd.... We
have already calcuted and checked..
Is This Answer Correct ? | 17 Yes | 6 No |
Post New Answer View All Answers
pls mail some more tecnical qustions at msaranya2610@gmail.com
What expenses counted in contingencies and how much it is in related to built-up area of the building.
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
What is meant by cartesian coordinate system?
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
how much cement sand n bricks required in im3?and how much in plaster?
which method is used in semi-rigid connection design??
What quantity of 1.0 m3 bricks required?
what is work of planning deptt. in any construction compny (in road project)
What is Gsb tollens ?
how statics is different from dynamics
where tie beam is used? what is the pupose? what dimension of tie beam can provided and number and diameter of steel bars to be used between the columns of 1333mm and 1400.
undistributed samples are obtained by