for 1cum how much bag of cement is used for M20 grade
Answers were Sorted based on User's Feedback
the ratio of M20 is1:1.5:3
so bag is requred to 7.96 bag
| Is This Answer Correct ? | 37 Yes | 8 No |
Answer / raichand s.
M20 Grade is 1:1.5:3
Total quantity- 1cum
Total mix- 1+1.5+3=5.5
Apply Voids 54% i e
cement quantity={((1*1.54*)/5.5)=0.28CuM
so volume of 1 bag cement is 0.035CuM
Required bags=0.28/0.035 = 8 Bag cement
| Is This Answer Correct ? | 15 Yes | 3 No |
Answer / pramod vs gowda
The mix proportion is 1:1.5:3
We find out the quantity of cement for 1cum
Dry co-efficient of cement is 1.52
Unit weight of cement 1440
Then
(1/(1+1.5+3))*1.52=0.276
0.276*1440=397.44kg/m3
1 bag cement is equal to 50 kgs
397.44/50=7.9488
So Approximately 8 bags of cement is for 1cum
| Is This Answer Correct ? | 12 Yes | 1 No |
Answer / shaik mahammad sharif
For M 20 grade Concret 1:1.5:3 ratio is required
1 is Cement, 1.5 is Fine Aggregate and 3 is Coarse Aggregate
Add 50% of wet cement concret =1.55 Cubic M
Cement Require for Cub M =(1.55/(1+1.5+3))*30=8.45 Bags
Sand =0.281*1.5=0.42 Cub M
Meterial =0.281*3=0.84 Cub M
| Is This Answer Correct ? | 5 Yes | 1 No |
Answer / raju sardar
As per the CPWD material consumption constants, 8.4 bags of
cement.
| Is This Answer Correct ? | 3 Yes | 1 No |
Answer / deep dubey
it depends on mix . its design mix or nominak mix.
in nominal mix 8 bag and in designmix we use 270 to 320 kg.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / mohan kumar
ratio 1:1.5:3
total mixing =1+1.5+3=5.5
area 1 cu m
(1/5.5)1.56*1=0.284 cum
=0.284*1440
=408.94 kg/cum
=408.94/50
=8.17 bags
| Is This Answer Correct ? | 0 Yes | 3 No |
what do you know that m20,m25
how many labour is required for 1cum of concrete?
What is the tallest man made structure in the world?
what course did you consider thinking before you enrolled in college?
What is the life of reinforcement?
DEFINATION OF CIVIL ENGINEERING
What is PCO
Do you know differenence between design mix and nominal mix?
Cube tests of concrete are failed at 7 days and 28 days.What is your next action?
what is the minimum SBC of soil is required for different types of soil?
Cement Co-eff. in block 1:6, brick1:4 work?
What is the meaning of unit weight of cement?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)