what is the venturi effect in buildings? what is green house
concept?different types of dams? which dam is economical arch
dam or gravity dam. what are the conditions favourible to both
of them?
No Answer is Posted For this Question
Be the First to Post Answer
Definition of plinth beam & Uses.
WHEN BRICK SIZE IS 3X5X9" , WHAT WOULD BE THE NUMBER OF BRICK REQUIREMENT FOR 100 SQFT AREA OF 5" width?
how many lab test on bricks and aggregate write briefly please
why seismic analysis not done during design of slabs
what is the difference b/w full length and cutting length?
what are the challenges of being a team leader and a supervisor?
Please send the graphical comparision Viscosity vs temp. for Penetration grade, Viscosity grade & CRMB.
What is meant by hydration of cement??
How to calculate the shuttering materials i.e MS sheet,Props,Acrow Spans,2'x3' Runner,4'x3' Runner & beam plywood bottom, sides in thumb rules in slab area
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
how to calculate steel quantity in plinth beam&footing
how 1.52 factor comes while calculating no of bags of cement...from 1:2:4 design mix?
4 Answers CCCL, L&T, Vishwa Infrastructures,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)