quantity of sand in cft in 1:6 cement sand mortar
Answers were Sorted based on User's Feedback
What is an ice dam sock?
what is the m25 test result 7 days 14 days
how you calculate the data (all parameter) after transient response method i.e.pile intigrity test on pile.
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
What is the life of reinforcement?
HOW WE WILL CALCULATE QTY. OF CEMENT,SAND & AGGREGATE (10MM&20MM) IN Kg.
4 Answers Nagarjuna Construction,
Though Column is a compression member and concrete takes compression, why we use steel at column ?
How to test the quality of Ready Mix M20 concrete (1:1.5:3) before casting at site when lorry arrives? Are there any methods?
For 1 cu m of concrete required 1.54 Cu m times dry volume. Pl give clarification of 1.54 factor
1 Answers RASA, Unity Infraprojects,
.5Ast
at which depth the construction of tunnel is economical from cost and engineering aspect.
what is the minimum cement content for M20 & M25 as per is code -456(2000).
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)