Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


To construct 100sq.yard what will be the cost in detail pls

Answers were Sorted based on User's Feedback



To construct 100sq.yard what will be the cost in detail pls..

Answer / rambabu

total coast=100*9.028*450=406260.00

Is This Answer Correct ?    2 Yes 5 No

To construct 100sq.yard what will be the cost in detail pls..

Answer / sjtbehera

1 yard = .8361 sqm = 9.028sqft
we apply Rs 450 per sqft
total coast= 9.028*450=Rs 4063.00
Note- Rs 45/ sqft0 is taken as bulding cost

Is This Answer Correct ?    3 Yes 7 No

Post New Answer

More Civil Engineering Interview Questions

How much quantity water should be placed in one cubic meter area?

0 Answers  


comparision difference between GSB and WBM subbase in road construction

1 Answers   CPWD,


what is the meaning fe in steel?

1 Answers   Manjeera, Oceanus, PAN, URC Construction,


Please explain soil invistigation methods?

2 Answers   IVRCL,


strength of bitumen concrete with 80-100 & 60-70 grade bitumen

0 Answers  


How to calculate the amount of cement & sand required for plastering work with ratio 1:4 please give me an answer with detailed step.

6 Answers   DSR Management, Simplex,


Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.

0 Answers   L&T,


what is the difference between NP2 Class and NP3 Class RCC Hume pipes

8 Answers   GWRDC, IVRCL, IVRL,


how to calculate rate analysis for column shuttering

2 Answers   L&T, Marg,


For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?

1 Answers  


How many No of 4" Bricks Get consumed in 9" thick BB Masonary Wall of 1 cu.m.?

2 Answers  


In which direction is bottom bar of rectangular footing is placed in short or long.

1 Answers   AKC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)