Answer / jakeer hussain
brick joint 10mm.
Brick volume 0.23x0.115x0.76=.0020m3
So for 1m3 brick work brick required=1/.0020=500nos
taking joint ,volume =.240x.125x0.086=.00245
Now for 1m3 brick work brick require=1/.00258= 388nos
So mortar volume =500-388=112nos brick=112x0.0020=0.32m3
For 1:6 mortar Cement 1/7x0.320=0.0457m3=0.00457/0.0345=1.32bags=1.32x50=66 kg
Sand=6/7x0.32=.274m3x35.28=9.67cft
Is This Answer Correct ? | 5 Yes | 1 No |
Answer / sooraj singh
cement=1
sand=6
sum=1+6=7
dry motor brick work=0.40cum
1 cum brick =500nos
1 cum brick masonry calculation.
cement=1*0.40/7=0.05714bags
sand=6*0.40/7=0.3428cum
Is This Answer Correct ? | 2 Yes | 2 No |
What is the meaning of M50,20? What is 50,what is 20
RCC MEANS
What is meant by Anchorage length? Development Length?
how inovative you are?...how do u define innovation?
Which is the IS code Using for Cement Sand Mortar
How will we calculate the number of cement bags in 6 foot by 6 foot footing?
what is the stripping time of beam?
which type of cement is used for RCC construction?Why?
what is a steel formula
what is pile foundation?
procedure to calulate the how much bag of cement is used for M20 grade?
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700