How much time Required for PPR pipe network testing
No Answer is Posted For this Question
Be the First to Post Answer
Ehat slump test of column & retaing wall.
indian standard split spoon sampler
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
What is the strength of cement?
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?
1.How much strength will be attained for M30 grade of concrete after 28 days? 2.Is it attain 30 N/mm2 or target mean strength?
how 1.52 factor comes while calculating no of bags of cement...from 1:2:4 design mix?
4 Answers CCCL, L&T, Vishwa Infrastructures,
how to do connection between steel beam (I-Section) with R.C.C column??
is load combination is necessary in staad pro design
What is the difference in design between Working Stress method & Limit State Method ? Briefly Explain.
What height of a 3.5 m high 300 x300 mm proposed col. can be casted at a time ?
what is step foundation
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)