cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
No Answer is Posted For this Question
Be the First to Post Answer
wat is the quntities of cement and sand for 10msquer wii plastering for 10mm tick
Define road.
mix proportion of M20 AND what are different grades below it
6 Answers B L Kashyap, L&T, Panchshil Infrastructure,
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
how many shuttering material required for 1000 sq.m built up area.
How to calculate the Qty of Mortar in 1 m3 Brick work? Detailed Calculation Required?
WHAT IS THE LAP LENGTH FOR COLUMN WITH DESIGN MIX M-35 RCC
7 Answers Omaxe, Shoba Devlopers,
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
Concrete how muvh strenght gain 7days,14day,s,21day's,28day's&56day's after curing
what is the wight of 4"/6" solid block?
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)