what is period of de-shuttering for different area of slab
of M25 grade?
Answers were Sorted based on User's Feedback
Answer / n.c.pathan.
It depends upon the span of the slab. For spans less than
6m we can remeve the props after 14 days and in case of
spans exceeding 6m we can remove the props after a period
of 21 days.
| Is This Answer Correct ? | 30 Yes | 5 No |
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
Describe the advantages and disadvantages of using plastic and timber fenders?
I am a new valuaer. I am seeking for instruments which r used to locate the site and from where I got it?
How to calculate Brick for 9"wall for100sqft
What are the materials used in building a gravity dam?
Can anybody please tell the procedure to calculate the quantity of admixture in Self Compacted COncrete??
what do you know that m20,m25
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
how to find water-cement ratio perfectly proportions M20, M25, M30
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
difference between ordinary portland cement concrete strength and pozzolona portland cement concrete strenth
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)