Answer / n.c.pathan.
It depends upon the span of the slab. For spans less than
6m we can remeve the props after 14 days and in case of
spans exceeding 6m we can remove the props after a period
of 21 days.
| Is This Answer Correct ? | 30 Yes | 5 No |
How to calculate unit conversion area
can you provide a link for manual design of building?
why we do pcc.?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
Who designed the city of washington dc?
What expenses counted in contingencies and how much it is in related to built-up area of the building.
What is the bearing capacity of black cotton soil, normal soil and rock?
role of constituents of cement? how they works
3 Answers BPTP, Gammon, L&T, Totem Infrastructure, Vishwa Infrastructures,
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
what is Quality Reporting?
What is proportion of PCC Grade G?
How to calculate density(dry & bulk) of sand from Sp. ravity value of sand. eg. G=2.5
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)