Answer / n.c.pathan.
It depends upon the span of the slab. For spans less than
6m we can remeve the props after 14 days and in case of
spans exceeding 6m we can remove the props after a period
of 21 days.
Is This Answer Correct ? | 30 Yes | 5 No |
what is the procedure of steel?pleas tell me how we can apply in any home or building?
why we are useing plastic under the lean concrete?and whts the advantage?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
The Hinged and Roller support is same or differnt if it is differnt how does it differs
1. why we use inverted beam ? 2.why we use extra bar in beam ? 3.dimension in L-bar in column ,footing and beam
what is the difference between highway and motorway?
how much extra rod length should be provided for beam
what is project?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
Why we use Reinforcement out side of the column not in centre
How to do lineout of building
"Why you consider yourself suitable for the post"
17 Answers Banking, CSE, IIP, IREDA, L&T, Maytas, McHugh, Nations Trust Bank, Teaching, Techkriti IIT Kanpur, Xantium Integrated Solutions,