Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is the deferance between LCN and UCN.



what is the deferance between LCN and UCN...

Answer / amit

LCN: Local Control Network is the Network Were number of UCN
(Universal Control Network)are Connected

UCN: Universal Control Network Were the Single DCS,PLC,FSC
etc..are Connected

These number of UCN's with DCS,PLC,FSC etc.are then
Connected to LCN and through LCN to all Server.

Is This Answer Correct ?    13 Yes 1 No

Post New Answer

More Instrumentation Interview Questions

How to calibrate and check thermal mass flow meter of Make thermal instrument company inc model 60?

1 Answers   Wood Group,


Why flow/pressure transmitter before control valve?

0 Answers   UPL,


What inherent design and operating principles are included in a modern control system to use predictive maintenance practices to increase overall system reliability?

0 Answers  


how to calculate range of Dp transmitter

1 Answers  


How to Calibrate Ultrasonic flow Transmitter in Field

0 Answers  


Which types of quections asked in interview for FORMULATION PLANT (PHARMA)

0 Answers  


When cryogenic control valve will be applied?

1 Answers  


In the field and in the control room different power supplies if used How to handle the ground

1 Answers   ITC Infotech,


pls give me presant awerness quistion and answer in my emailid.

0 Answers  


which transister (npn or pnp) is used in vibration monitoring for negative voltage? 

2 Answers  


Why would an Engineer consider combining FEEDBACK and FEEDFORWARD control in some applications?

4 Answers   Jindal,


what does it mean an active front end in vfd plz explain it briefly

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)