Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


for 8 mva 33/11 kv transformer what will be the setting of
differential relay on which it trip & what is the HF
setting in this relay

Answers were Sorted based on User's Feedback



for 8 mva 33/11 kv transformer what will be the setting of differential relay on which it trip &am..

Answer / kanwer

diffferentail rely setting 5% off rated current and hf
setting is 52.

Is This Answer Correct ?    1 Yes 0 No

for 8 mva 33/11 kv transformer what will be the setting of differential relay on which it trip &am..

Answer / amir_7442

ok but i ask what is HF in this relay ?

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

What happen if field ckt is open when a sailent pole alternator connected to infinite bus

3 Answers   Bhel, Nilkamal,


can we ran equipment up to 10kw between phase to grounding/ earthing. beside above can we use grounding instead of neutral. .

1 Answers   TNEB Tamil Nadu Electricity Board,


what is corona ?

3 Answers  


why the supply power frequency is 50hz in india? where as it is 60hz in US?

4 Answers  


Is there a possibility to use such a treshold voltage for the NMOS part of a CMOS circuit that during the switching it will start conducting only after the PMOS part will be already closed, by this eliminating the leakedge current? Please note, I'm not asking about the well bias in standby mode, but about the "antileakedge" measures during normal operation.

0 Answers  


why the single phse machine can not run by the three phase supply.

2 Answers  


Define cuttoff frequency?

0 Answers  


Why squirrel case induction motor bar is skew permanently?

1 Answers   Nesco,


Is there any abbrevation for STUB in Stub bus protection

0 Answers  


What is the rating of your capacitor bank at your company.

36 Answers   Ajnara Group, Amara Raja, Amol Electricals, Apollo, ATC, Bhagiradha Chemicals & Industries, Bharat, CBRE, Cisco, Government, JLL, MEIL, Reliance, Sterling, TNEB Tamil Nadu Electricity Board, Torrent Pharma, Victory,


i have a Connected Load of 280KW and Maximum Demand of 224KW to one of SMDB under design with me. which criteria should i consider to design panel and main cables connected Load or Maximum Demand 1)Breaker rating 2)Panel Busbar rating 2)Incommer cable sizing (ignore Voltage drop)

1 Answers  


Dyn1 transformer vector group testing how to do

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)