3,12,24,33,_ ,75,150 Find the missed number in this sequence
Answers were Sorted based on User's Feedback
66 ( add 9 ,double ,add 9 ,double..... )
| Is This Answer Correct ? | 34 Yes | 1 No |
Answer / jenna branche
you take the 12 and and add the the two digits and you get 3 so u have (3, 3, ...) then you take 24 and add the two digits and you get 6 and the you take 33 and add the two digits so u have ( 3, 3, 6, 6 ...)then you take 66 and add the digits so you get 9 so the next number would be 75 because 7 plus 5 is 9.so you have (3, 3, 6, 6, 9, 9)
| Is This Answer Correct ? | 1 Yes | 22 No |
Why we are designed only 11Kv and 6.6Kv Alternators, not 33Kv Alternators and Power Transmission side we are designed only 220kv, 120kv, 66kv, 33kv, 11kv, and 440volts, not 20kv, 50kv, 100kv.
Can we install and run MCCB suitable for 440v 3Phase 4wire system, on a 220V 3Phase 4Wire System.
lead acid battery electrolity?
how to select energy meter? have any calculation?
how capacitor can split the phase.
how to decide the load on secondary of the tranformer
Give the topology of current amplifier with current shunt feedback?
what is the advantage of connecting capacitors in delta than in star?
line vltage of three phase distribution transformer is 433v and phase voltage is 250v,but we required 230v for domestic distribution,then how we reduce phase voltage of transformer
How much energy save vfd if motor run on 50 Hz (full speed)
How to Convert Gen KW to H.T amps ?
in 1-phase 230v,how in 3-phase 440v. in each phase in between 230v.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)