Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


calculation of cement bags in 1:2:4 concrete mix

Answers were Sorted based on User's Feedback



calculation of cement bags in 1:2:4 concrete mix ..

Answer / basharat ali

1.54/sum of ratio
1.54/7=.22cum cement
.22/.0347=6.340bags cement (Say 7)
.22×2=.44cum :-15.5368cft :-19.047bags
.22×4=.88cum:- 31.07cft:-38.09bags

Is This Answer Correct ?    0 Yes 0 No

calculation of cement bags in 1:2:4 concrete mix ..

Answer / engr. daniel otoyo

Normal concrete such as 1:2:4 mix has a density of 2400kg/cm
1cm of concrete will weigh 2400x1kg = 2400kg
Sum of mix ratio = 1+2+4 = 7
Ratio (fraction) of cement weight = 1/7
Weight of cement (in 1cm concrete) is therefore = 1/7 x 2400 = 342.857kg
Cement in 50kg bags will give us 342.857/50 = 6.86kg
This approximates to 7bag/cm of 1:2:4 concrete if the desired strength is to be achieved.
Other constituent like fine and coarse aggregates can be solved likewise and their densities used to translate their weight into volumes.

Is This Answer Correct ?    0 Yes 0 No

calculation of cement bags in 1:2:4 concrete mix ..

Answer / ruatsanga

For 1 m3 of Concrete (1:2:4)
Required volume of concrete = 1 m3
Estimated volume of dry material = 1 x 1.54 (1.54 = constant)
= 1.54 m3
Mix total = 1 + 2 + 4 = 7 ( 1 : 2 : 4 )
Ingredients Volume = 1.54 x 1/7
= 0.22 m3 of cement
#Bags of cement = 0.22 / 0.035 (per 50 kg Bag)
= 6.289 bags of cement

Is This Answer Correct ?    0 Yes 0 No

calculation of cement bags in 1:2:4 concrete mix ..

Answer / gopalakrishna

cement: 1*1.33/7=0.19*1440=273.6/50=5.47bags say 6
sand :2*1.33/7=0.38 cum ,jelly 20mm =4*1.33/7=0.76cum

Is This Answer Correct ?    8 Yes 10 No

calculation of cement bags in 1:2:4 concrete mix ..

Answer / ngozi favour

no volume is given. Then it
just 1bag of cement to 100kg
of fine aggregate and 200kg
of coarse aggregate

Is This Answer Correct ?    7 Yes 12 No

calculation of cement bags in 1:2:4 concrete mix ..

Answer / syed mohd akram

1:2:4 MIX m 6.4bags lagte ha

Is This Answer Correct ?    7 Yes 18 No

Post New Answer

More Civil Engineering Interview Questions

castigliano's theorems are based on

6 Answers   Essar,


why curing is necessary?

5 Answers   Gammon,


Form where IS456 is adopted in 1978?

0 Answers  


1) what is the seewage discharge per person per day taken for design purpose as per IS codes? 2) how to convert gauge to MM like if we measure 18G as our door frame then how much is it in MM ? 3) how much binding wire is required ti tie 100kg steel ? 4) while making rings in steel reinforcement , whether the corners of rings are deducted to take out cutting length ? 5) how much carbon content should be there in steel used for construction purpose? 6) what are fe415 & fe 500 and which bars are used in general civil works?

1 Answers  


if compressive strength on 28day pass, and client is asking core test. is there any thing in standards allows that??

1 Answers  


How many square meter can mason layout chb per hour

0 Answers  


What is mean by grade of steel?if Fe 415,Fe500- what is this 500 and 415 denotes?

3 Answers   ECC,


wat is fe full form in fe4l5?

7 Answers  


in a corner footing of a building, column lies in one corner. in this condition i want to know if the reactive pressure of soil will be uniformly distributed throughout the footing or will be uniformly varying as in the case of eccentrical loading.

0 Answers   Apex,


what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght

0 Answers  


What is creep ,deflection and shrinkage in concrete

3 Answers  


1.DIFFERENCE BETWEEN NOMINAL MIX AND DESIGN MIX? 2.WHAT IS MEANT BY STRUCTURAL DESIGN? 3.IN STAAD WHY WE RELEASE MOMENT TO A MEMBER? 4.ON WHAT BASIS PARTIAL FACTOR OF SAFETY ARE DECIDE?FROM THE LOAD COMBINATION? 5.WHY WE PROVIDE EXTRA BAR & DEVELOPEMENT LENGTH AT TOP? 6.FULL FORM OF SPT & SMB? 7.WHAT IS MEANT BY ITP IN A CONSTRUCTION PROJECT? 8.WHAT IS LEAST COUNT OF THEODOLITE SURVEY? 9.WHAT ARE THE CAUSES OF FAILURE OF FOUNDATIONS AND REMEDIAL MEASURES? 10.WHAT ARE THE VALUES OF COMPRESSIVE STRENGTH? 11.STEEL CALCULATION FOR FOOTING,BEAM & SLAB? 12.WHAT IS MEANT BY GANTRY GIRDER? 13.IN SITE HOW WE CAN IDENTIFY THE ONE WAY, TWO WAY SLAB? 14.DIFFERENCE BETWEEN ANCHORAGE LENGTH & DEVELOPEMENT LENGTH? 15.BEARING CAPACITY OF STEEL SHUTTERING?LOAD CARRYING FOR SHUTTERING?

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)