if compressive strength on 28day pass, and client is asking
core test. is there any thing in standards allows that??
Answer / ramesh potaraju
if compressive strength on 28 day pass.
but that will not reached TARGET MEAN STRENGTH .
That's why client is asking for core testing
| Is This Answer Correct ? | 4 Yes | 0 No |
Which is stronger solid steel rod or hollow steel pipe?
What is the difference between lap splice length and development length of rebars?
How to calculate the quantity of water in cement mortar eg. CM 1:3?
how to calculate quantity of concrete volume of pile with bulb
how to calculate upthrust pressure of under ground water tank in wet soil?
WHEN A RIVER STARTS MENDERING WHAT CONDITION WILL OCCUR?
I need to plaster an area of 1500 square meter. how much quantity of cement and sand need for this.?
What is the design mix? What is the proportion for M25, M35, M40 concrete mix.
9 Answers ACC, DBM, Era Infra Engineering, Thakural Constructions,
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
who to find building iron rod strenth
what is the formula of concrete quantity
4 Answers NKB, Soma Enterprises,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)